What We offer

(Modular Spaces for Every Purpose)

CUBICORE delivers complete modular solutions that cover every essential space — from accommodation and dining to recreation and fitness. Each module is purpose-built, easily combined, and engineered for comfort, safety, and efficiency.

Accommodation

Private or shared modules for workforce and residential needs.

Gym

Recreation and fitness modules to improve onsite wellbeing.

Dining

Fully equipped canteens and meal prep spaces for daily and group dining needs.

Entertainment

Leisure areas and social lounges that create a balanced living environment for long-term stays.

Why Choose CUBICORE

Precision Manufacturing

All modules are produced under Australian-certified quality systems, ensuring every unit meets AS/NZS standards for safety and performance.

Built for Harsh Environments

Weather-resistant materials and anti-corrosion finishes guarantee long service life in mining and remote regions.

Efficient Delivery & Installation

From design to delivery, we handle logistics, customs, and onsite setup with precision and reliability.

Find out more➡️

How We Build

Every CUBICORE project follows a clear, efficient process — from early design and engineering to factory manufacturing, transport, and onsite installation. Our streamline workflow ensures speed, precision, and reliability at every stage.

Step 1: Design & Planning

We begin with detailed design and engineering based on your project requirements. If a full concept design is required, this stage typically takes 3~5 weeks including Structure setup and material review.

Step 2 Manufacturing

After all drawings and materials are checked, model production will start. This period will last 1-2 months depend on theamount of unit.

Step 3: Transportation

Completed units or pefabed panels are securely packed and shipped via ocean, railway or road. We will provide a detailed delivery plan covering costs, schedule, and risk assessment to ensure safe arrival.

Step 4: 0n-site Installation

As products produced from factory are delivered to the construction site, this period may lasts 10 days or moredepends on the design proposal. Units can be installed to the foundation directlly while panels needs labours to install. Little on-site cutting or concretung is needed.

Step 5: Final Inspection & Handover

After on-site installation, there is a comprehensive quality check to ensure all systems function as designed. It will last a few days. Once approved, the completed project is ready for occupancy.