What We offer

(Modular Spaces for Every Purpose)

CUBICORE delivers complete modular solutions that cover every essential space — from accommodation and dining to recreation and fitness. Each module is purpose-built, easily combined, and engineered for comfort, safety, and efficiency.

ICON

Accommodation

Private, acoustically-insulated living quarters designed for maximum rest and recovery, featuring ensuite bathrooms and premium thermal protection for high-quality FIFO living.

ICON

Office

Scalable modular office solutions offering flexible open-plan or partitioned layouts to suit site-specific operational needs, from engineering hubs to administrative centers.

ICON

Dining

Industrial-grade commercial kitchens and spacious mess halls engineered for high-volume food prep and comfortable communal dining, fully compliant with Australian health and safety standards.

ICON

Entertainment

Vibrant recreational hubs and 'Wet Mess' modules designed for worker socialisation and mental wellbeing, offering multi-purpose layouts for gyms, cinemas, or lounge areas.

3 Unit Accommodation

Why Choose CUBICORE

Precision Manufacturing

All modules are produced under Australian-certified quality systems, ensuring every unit meets AS/NZS standards for safety and performance.

Built for Harsh Environments

Weather-resistant materials and anti-corrosion finishes guarantee long service life in mining and remote regions.

Efficient Delivery & Installation

From design to delivery, we handle logistics, customs, and onsite setup with precision and reliability.

Find out more➡️

How We Build

Every CUBICORE project follows a clear, efficient process — from early design and engineering to factory manufacturing, transport, and onsite installation. Our streamline workflow ensures speed, precision, and reliability at every stage.

Step 1: Design & Planning

We begin with detailed design and engineering based on your project requirements. If a full concept design is required, this stage typically takes 3~5 weeks including Structure setup and material review.

Step 2 Manufacturing

After all drawings and materials are checked, model production will start. This period will last 1-2 months depend on the amount of unit.

Factory project

Step 3: Transportation

Completed units or pefab panels are securely packed and shipped via ocean, railway or road. We will provide a detailed delivery plan covering costs, schedule, and risk assessment to ensure safe arrival.

Step 4: On-site Installation

As products produced from factory are delivered to the construction site, this period may lasts 10 days or moredepends on the design proposal. Units can be installed directlly to the foundation while panels needs labours to install. Little on-site cutting or concreting is needed.

Project implementation

Step 5: Final Inspection & Handover

After on-site installation, there is a comprehensive quality check to ensure all systems function as designed. It will last a few days. Once approved, the completed project is ready for occupancy.

Project implementation